The forecast that's always a month behind
Ask a builder-director when the next frame claim on a job will land and you'll often get three different answers from inside the same business.
The contract says one date. It was set when the job was signed, using standard durations for each stage, and it hasn't moved since. The claims board, usually a spreadsheet or a wall of tiles that someone drags across each fortnight, says another. And the site supervisor, who was standing on the slab this morning, knows the real one.
Most cashflow forecasts are built from the first two. The third, the only one based on what is actually happening, lives in a phone, a diary or a supervisor's head.
That's why the forecast is always a month behind. It isn't wrong because someone made a mistake. It's wrong because it's reading the wrong schedule.
Three schedules, three jobs
When we built the operating system for a luxury design-and-construct builder in Brisbane, we didn't try to force those three schedules into one. Each does a different job, so the system keeps all three:
- The contract schedule is the baseline. It's set from the contract date and standard stage durations, and it never moves when someone edits a tile. Its job is to show how far a project has drifted from what was promised. "Contract date · 12 days behind" is a measure of performance, not a forecast.
- The claims schedule is the office's working plan: fortnightly tiles for each stage, dragged as the programme changes. Its job is to plan the claims run.
- The supervisor schedule holds eight milestone dates for each job: deposit, site start, slab, frame, enclosed, fixing, practical completion and handover. It's blank by default. A supervisor fills in a date when it's real, and that date locks the moment it's entered, with every change audited.
The rule that makes it work
Holding three schedules is only useful if the system knows which one to believe. The rule is simple, and it applies stage by stage:
Use the supervisor's date if there is one. If not, use the claims schedule. If neither exists, fall back to the contract.
In practice, supervisor dates start appearing at site start and progressively take over. Early in a job the forecast leans on the contract. By frame stage it's reading what the site says. The claims tiles stay visible for comparison, but they stop driving the forecast for any stage where a supervisor has committed to a date.
Locking matters more than it sounds. A date that can be quietly edited back and forth is just another opinion. A date that locks on entry, with an audit trail if it ever has to change, becomes something the office can bank on. It's also something the supervisor takes care over before they enter it.
Why the supervisor's date wins
The person closest to the work has the best information. That's not a software insight; every builder already knows it. The problem has always been getting that information into the forecast without another phone call, another spreadsheet or another meeting.
So the supervisor view is deliberately small: one table, jobs down the side, eight milestones across the top, edited in place, with a filter for each supervisor's own jobs. And because the system tracks how many of each supervisor's dates are filled in and locked, the office can see which jobs the forecast can trust and which it can't.
The same system tracks the things that make a supervisor's fortnight visible to the office and the client: whether a client update went out, whether progress photos were uploaded, and whether a safety walk was done. Gaps are highlighted before the client notices them.
From forecast to margin
Getting the dates right is the first half. The second is connecting them to the number the owner actually cares about.
This builder runs the business on a simple formula: a monthly revenue target at a target gross margin, with everything above overheads counted as profit. The system checks that formula every fortnight, not at month end. Claims expected from each stage, dated by the rule above, roll up into revenue for the fortnight and the month. Forecast gross profit for each job rolls up beside it. A traffic light on every job shows where the business stands against the target.
When the slab is poured on Tuesday, the claim is visible on Tuesday, and so is its effect on the month.
Where to start
You don't need new software to start. You need to answer three questions honestly.
Get those right and the forecast stops being a month-end report. It becomes a picture of today.
Want to know what your own margin slip is worth? Run the margin-leak calculator. Three numbers, thirty seconds, no email needed.